Call us and the team to discuss your project or submit your project specifications online. Our team will promptly provide a quote for your approval and payment.
Once you’ve accepted the quote, we’ll book your job and talk you through the schedule. In most circumstances, our field officers can be on site the same day or within 48 hours.
For water main pressure tests, you’ll need to ensure we can access each end of the pipeline. The pipe should be full of water with all air bled out and be at either mains pressure (approximately 500–600 kpa) or test pressure ( 1000–1200 kpa). For sewer main vacuum tests, the drain must be clean and there must be have good access to the work area, e.g. next to a manhole.
Our experienced field officers will test, sample and treat your pipes as per the specifications of the project. Our mobile fleet is completely self-sufficient, requiring only a small space to conduct our testing. Any bacterial samples will be sent to our NATA-certified laboratory partners for testing.